In 2015/2016, AyTec Automation GmbH built a new industrial building near Rosenhof in the district of Regensburg. Two production halls and an administration building were built on the 40,000 square metre site. We accompanied the construction from the laying of the foundation stone to the handover of the keys, including the relocation of the machines from the old building to the newly built one.
The following were used:
- Drone for aerial photography
- several time-lapse cameras (daily and long-term time-lapse)
- Video camera