We created a photo documentation and a time-lapse for the Southern Bavarian Motorway Directorate on the dismantling work of a temporary bridge. The temporary bridge spanned the BAB 3 between the Neutraubling and Rosenhof junctions. The bridge was demolished within one night with all lanes fully closed.
Dismantling temporary bridge
Period: 18/19 October 2020
Kategorie: Abbruch, Bilddokumentation
Project description
Further reference photos only on request!