On 09.10.2020 at around 1 pm, the bridge on Walhallastraße was opened to traffic. It leads over the A3 motorway and connects the towns of Barbing and Neutraubling, as well as directing the...
For the former Autobahndirektion Südbayern (now Autobahn GmbH des Bundes Niederlassung Südbayern) and the company Lots* Gesellschaft für verändernde Kommunikation mbH, we designed the bridge construction site on the A3 in Regensburg-Burgweinting,...
Raiffeisenbank Sinzing eG built a new office building for rent and lease in 2017/2018. A multifunctional building is being constructed on the 1,500 square metre site. On the ground floor, 600 square metres of storage space...
In 2015/2016, AyTec Automation GmbH built a new industrial building near Rosenhof in the district of Regensburg. Two production halls and an administration building were built on the 40,000 square metre site. We have...